Start a conversation

Who is responsible for ensuring an inspection is completed?

The person who controls the operation of an air conditioning system must:

  • ensure an inspection has been done in accordance with the requirements and timetable of the regulations
  • keep the most recent air conditioning inspection report provided by an energy assessor
  • give any air conditioning inspection report to any person taking over responsibilities with respect to the control of the air conditioning system

If the control of an air conditioning system is passed to another person and that person has not been given an air conditioning inspection report by the previous operator of the system, the system must be inspected within three months of the new operator taking over control of the system.

Choose files or drag and drop files
Was this article helpful?
Yes
No
  1. Mike Gordon

  2. Posted

Comments