The example below shows an air conditioning system with a cooling capacity greater than 250kW that serves three separate parts of a building that are designed for separate use. Although the air conditioning system serves three parts of a building that are designed for separate use the air conditioning system is a single system under single control for the whole building with a cooling capacity greater than 250kW. An air conditioning inspection on a system with a cooling greater than 250kW should have been carried out by 4 January 2009. A revised air conditioning inspection report would be required every 5 years from the date of the initial inspection.